Riverpoint One to Phase I – AE1400

<a href="https://staging-inside.ewu.edu/facilities/news/projects/" title=" < return to projects page Scope of Work: Programming and schematic design for new space in Phase I building. Total Budget: $200,000  Current Project Phase: Completed Design Consultant: Integrus – Spokane, WA General Contractor: In-house EWU Contact: Jim MoellerSenior Project Managerphone: 509.359.6565email: jmoeller@ewu.edu

Substation Fuel Tank Install – AE1402

<a href="https://staging-inside.ewu.edu/facilities/news/projects/" title=" < return to projects page Scope of Work: Replacing Day tank and amenities for emergency generator fueling system Total Budget: $17,000 Current Project Phase: Completed Design Consultant: Centennial/nw Fuel Systems General Contractor: Colvico Electric – Spokane, WA EWU Contact: Steve SchmeddingSenior Project Manager – Facilities Engineerphone: 509.359.4205email: sschmedding@ewu.edu

JFK Library Security Control – AE1405

<a href="https://staging-inside.ewu.edu/facilities/news/projects/" title=" < return to projects page Scope of Work: Develop programming and schematic design to separate the main floor of the JFK Library from the basement and upper floor for extended hours use by students. Total Budget: $budget Current Project Phase: Phase Design Consultant: ALSC Architects – Spokane, WA (Ken Murphy) EWU Contact: … Read more

EWU Advising Center – AE1407

<a href="https://staging-inside.ewu.edu/facilities/news/projects/" title=" < return to projects page Scope of Work: Remodel of third floor Monroe Hall for Advising Center.  In House construction. Total Budget: $100,000 Current Project Phase: Closeout Design Consultant: Integrus – Spokane, WA EWU Contact: Troy BesterSenior Project Managerphone: 509.359.2204email: tbester@ewu.edu