- This event has passed.
CP1056 – Rozell Central Energy Plant: Install New Boiler – Engineering/Architectural Design and Construction Phase Services – RFQ
September 20, 2019 @ 3:00 pm
Request for Qualifications – Engineering/Architectural Design and Construction Phase Services
Visit Questcdn.com. Enter Project Number #6504231 into the Project Number search field.
- By downloading the free project advertisement, you will be added to the plan holders list which ensures automatic project updates, notifications and award results.
Project:
This project will replace aged existing boiler(s) and increase EWU’s campus steam capacity to meet future heating needs in support of the current capital master plan, provide sufficient redundancy during scheduled maintenance operations, and to increase operating efficiencies. The existing campus heating system is comprised of five boilers that initially provided a total capacity of one hundred thirty four thousand (134,000pph) pounds per hour. One boiler has been removed from the train, thus reducing capacity to 116,000pph. Historical records indicate a peak heating load of about seventy five thousand (75,000pph) has been experienced at the plant. Based on the anticipated master plan growth, the increased heat load is expected to be approximately 34%, or around 100,000pph. The addition of approximately 40,000pph heating capacity is needed to serve the campus into the future.
Scope of Service:
The University is seeking proposals from qualified Mechanical Engineering firms. Applicants should only include information in their proposals pertaining to their own firm’s Design and Construction Administration experience and qualifications. Do not add information for any sub-consultants that may be considered for this project. Sub-consultants will be chosen at the discretion of the selected consultant with the owners approval.
Submittal Requirements:
Submittals must be received at the Construction and Planning Services Office, 1115 Cedar St, Rozell Plant, Eastern Washington University, Cheney, WA 99004-2464, by 3:00 p.m., Friday, September 20, 2019.
Consultant selection will be based on EWU’s established procedures. To be considered for selection, prospective consultants are to provide:
- Provide five (5) copies and one (1) electronic .pdf on CD or thumb drive containing;
- Cover letter; sub-sections addressing the four criteria for selection which are
- (a) Qualifications of Key Personnel,
- (b) Relevant Experience,
- (c) Performance on Previous Projects,
- (d) Firm’s Ability to Perform Requested Services;
- Completed Federal Standard Form 330.
- Cover letter; sub-sections addressing the four criteria for selection which are
- Please be concise and do not include information that does not pertain/relate to this project
Selection Process:
Voluntary MWBE goals of 10% minority, 6% women, and 5% WA small business and 5% veteran-owned business have been established for this project. Achievement of the goals is encouraged. However, no minimum level of MWBE participation is required and such goals will not be used as a criterion for selecting contractors. EWU is an affirmative action employer.
A/E Selection procedures are available on the EWU website for Construction and Planning Services at:http://access.ewu.edu/facilities/depts/cp/request-for-qualifications
EWU reserves the right to continue with the consultant selected or has the option to conduct a new consultant selection process for future services beyond those advertised above.
Proposed RFQ Timeline:
- Submittal deadline:
- 3:00 p.m., September 20, 2019
- Evaluation:
- September 23, 2019 to October 7, 2019
- Finalist Notification:
- October 9, 2019
- Interview scheduled:
- October 21st to October 24th, 2019
- Award:
- November 8, 2019
- Notice to Proceed:
- Mid December, 2019
EWU Contacts:
For additional information, contact EWU Construction & Planning: Steve Schmedding, P.E., Facilities Engineer, Sr. PM, at (509) 359-4205 or Jacque Early, Admin Specialist (509) 359-6746.