Electrical Capacity Upgrade – AE1483

<a href="https://staging-inside.ewu.edu/facilities/news/projects/" title=" < return to projects page Scope of Work: Required Electrical Upgrade to meet the electrical needs of the ISC building. Total Budget: $400,000 Current Project Phase: Design Design Consultant: NAC Architecture – Spokane, WA EWU Contact: Steve SchmeddingSenior Project Manager – Facilities Engineerphone: 509.359.4205email: sschmedding@ewu.edu RFQ/Bid Information: Bid (Quest Project #) Bid … Read more

Tunnel Transformer Replacement Zone 1 – AE1509

<a href="https://staging-inside.ewu.edu/facilities/news/projects/" title=" < return to projects page Scope of Work: Transformer that power parts of the steam tunnel failed and cannot be repaired; new transformer, emergency generator and associate electric devices will be replaced (JOC) Total Budget: $85,000 Current Project Phase: Phase Design Consultant: NAC Architecture General Contractor:  Burton Construction EWU Contact: Steve SchmeddingSenior … Read more

Rozell Parking Lot & Access Drive Reconstruction Project – AE1419

<a href="https://staging-inside.ewu.edu/facilities/news/projects/" title=" < return to projects page Scope of Work: Replace parking lot that was removed due to the need to mitigate the Bunker C oil tanks adjacent to Rozell Plant. Total Budget: $400,000 Current Project Phase: Phase Design Consultant: TD&H, Spokane, WA – Dan Wolf General Contractor:   EWU Contact: Steve SchmeddingSenior Project … Read more

Electric Charging Stations – AE1479

<a href="https://staging-inside.ewu.edu/facilities/news/projects/" title=" < return to projects page Scope of Work: Install electric car charging stations at the EWU Visitors Center (2 each) and Computer Engineering Building (two each). Total Budget: $budget Current Project Phase: Completed Design Consultant: NAC Architecture – Spokane, WA EWU Contact: Steve Schmedding Senior Project Manager – Facilities Engineer phone: 509.359.4205 … Read more

Water System Capital Renewal Project – AE1345G1

<a href="https://staging-inside.ewu.edu/facilities/news/projects/" title=" < return to projects page Scope of Work: Project to evaluate, design, and construct well work, treatment facility, piping and valve replacement, emergency intertie work, flow and pressure boosting stations, general campus water system improvements. Total Budget: $7,278,000  Current Project Phase: Completed Design Consultant: TD&H – Spokane General Contractor: Blue Star Enterprises … Read more

Substation Fuel Tank Install – AE1402

<a href="https://staging-inside.ewu.edu/facilities/news/projects/" title=" < return to projects page Scope of Work: Replacing Day tank and amenities for emergency generator fueling system Total Budget: $17,000 Current Project Phase: Completed Design Consultant: Centennial/nw Fuel Systems General Contractor: Colvico Electric – Spokane, WA EWU Contact: Steve SchmeddingSenior Project Manager – Facilities Engineerphone: 509.359.4205email: sschmedding@ewu.edu